首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with strong randomness.In this paper,the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project.Under the premise of actual situation and the experience of the construction site,an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria.In this way,the deficiency of certain allocation model can be overcome.The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.  相似文献   

2.
The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.  相似文献   

3.
对高速铁路下行MIMO-OFDM系统中的动态资源分配问题进行研究.联合考虑子载波、天线、时隙和功率,将多维资源分配问题建模为混合整数非线性规划问题.分析移动速度对多普勒频移的影响,并计算子载波间干扰功率.在总发射功率不超过一定阈值的约束条件下,将最大化系统吞吐量作为优化目标.为了降低求解最优化问题的计算复杂度,采用两步求解法得到次优解.首先,在等功率分配的前提下,将子载波、天线和时隙分配给不同用户.然后,根据第1步资源分配的结果,进行功率分配.仿真结果显示,提出的多维资源分配策略与已有策略相比在系统吞吐量方面具有较大的性能提高.  相似文献   

4.
随着施工技术的飞速发展,混凝土面板堆石坝已经成为现代水利枢纽工程的主要坝型之一。渭南市涧峪水库在堆石面板坝的施工中,采用了先进的挤压式混凝土边墙施工技术,提高了施工质量,为同类工程施工积累了宝贵的经验。  相似文献   

5.
构建和谐社会视角下的教育资源优化配置   总被引:1,自引:0,他引:1  
教育资源的优化配置是构建和谐社会的基石。构建和谐社会,追求教育资源公平有效地配置已是当前的焦点。通过对和谐社会内涵的阐述及对教育资源优化配置与建设和谐社会二者之间相互关系的分析,针对我国在建设和谐社会过程中对教育资源的分配使用存在的一些问题,从政策法制、方式手段及一些具体的操作等方面提出一些建议和对策。  相似文献   

6.
决策论中有一类人力资源分配问题,解决这类问题通用的方法是线性规划法.经过研究发现,这类问题具有阶段性、顺序性和可分离性.对该问题进行转化,给出了解决这类问题的动态规划算法.这类方法动态地揭示了决策者在优化人力资源方面的全过程,弥补了线性规划在处理这类问题中的不足(不能细化决策的全过程).  相似文献   

7.
Lean construction has been newly applied to construction industry. The best performance of a project can be achieved through the precise definition of construction product, rational work break structure, lean supply chain, decrease of resources waste, objective control and so forth. Referring to the characteristics of schedule planning of construction projects and lean construction philosophy, we proposed optimizing methodology of real-time and dynamic schedule of construction projects based on lean construction. The basis of the methodology is process reorganization and lean supply in construction enterprises. The traditional estimating method of the activity duration is fuzzy and random;however, a newly proposed lean forecasting method employs multi-components linear-regression, back-propagation artificial neural networks and learning curve. Taking account of the limited resources and the fixed duration of a project, the optimizing method of the real-time and dynamic schedule adopts the concept of resource driving. To optimize the schedule of a construction project timely and effectively, an intellectualized schedule management system was developed. It can work out the initial schedule, optimize the real-time and dynamic schedule, and display the schedule with the Gant Chart, the net-work graph and the space-time line chart. A case study was also presented to explain the proposed method.  相似文献   

8.
Concave resource allocation problem is an integer programming problem of minimizing a nonincreasing concave function subject to a convex nondecreasing constraint and bounded integer variables. This class of problems are encountered in optimization models involving economies of scale. In this paper, a new hybrid dynamic programming method was proposed for solving concave resource allocation problems. A convex underestimating function was used to approximate the objective function and the resulting convex subproblem was solved with dynamic programming technique after transforming it into a 0-1 linear knapsack problem. To ensure the convergence, monotonicity and domain cut technique was employed to remove certain integer boxes and partition the revised domain into a union of integer boxes. Computational results were given to show the efficiency of the algorithm.  相似文献   

9.
It is important and difficult to control the temperature of mass concrete structure during high arch dam construction.A new method with decision support system is presented for temperature control and crack prevention.It is a database system with functions of data storage,information inquiry,data analysis,early warning and resource sharing.Monitoring information during construction can be digitized via this system,and the intelligent analysis and dynamic control of concrete temperature can be conducted.This method has been applied in the construction of the Dagangshan Arch Dam in China and has proven to be very convenient.Based on the decision support of this system and the dynamic adjustment of construction measures,the concrete temperature of this project is well-controlled.  相似文献   

10.
针对可重构计算中对FPGA逻辑资源动态分配问题开展了深入的研究,详细分析了再FPGA上实现可重构设计问题时资源动态分配的常用策略。提出了一种基于局部最优性的资源动态分配算法,该算法既考虑了资源动态分配的最优化特点.同时也综合了算法实现难度和任务可重构实现等待延时等主要因素,经测试表明,本文提出的资源动态分配算法资源利用率平均可达到60%以上,任务加载平均延时为3.5毫秒.总体性能优于传统的资源分配算法。  相似文献   

11.
为了节约移动设备的电量消耗,提出了一种适合于普适计算环境的动态软件部署算法.综合考虑了软件组件的计算、通信和移动所消耗的费用,建立了一个在移动设备和服务器间组件部署的电量消耗模型.在软件部署中同时也考虑了组件的移动性和组件间的移动关系.利用网络流理论,将节约电量的最优化问题转化为一个流网络的最优分割问题,而后者可采用最大流最小切割算法实现最优切分.实验结果表明提出的算法比现有算法能够节约更多的电量.  相似文献   

12.
研究了多用户场景下多载波码分多址系统(MC—CDMA)的下行信道和功率分配,并将吞吐最大化问题建模成一个混合整数优化问题.为了简化分析,将问题分成2个低复杂度的子问题:功率分配和信道分配.这2个子问题可分别被一个次最优自适应功率分配算法(APA)和一个最优自适应信道分配算法(ACA)解决.通过联合APA和ACA算法,进一步提出了一个自适应信道和功率的分配方案.仿真结果表明:与传统的均匀功率分配算法相比,提出的APA算法更加适用于MC—CDMA系统;此外,提出的自适应信道和功率分配方案可以显著地提高系统吞吐量性能.  相似文献   

13.
从市场运行的现状来看,企业年金并没有达到预期的规模。究其原因主要是因为企业年金的方案设计并不合理。确定个人账户余额的关键问题是利益分配公式的设计。工资比例法认为,仅按照个人工资为权数分配企业缴费就是最合理的方式,但各项指标过笼统,不能很好地发挥激励作用。个人综合系数法体现了企业年金的激励功能,并考虑了即将退休职工的加速积累补偿问题。综合比例调节法发挥了公平保障功能和激励功能,但是较为繁琐,计算量很大。缴费负担分摊法可以实现缴费额在企业缴费和个人缴费间的分摊,最大限度地发挥了激励功能。要完善企业缴费分配模式必须要合理界定参加人员范围,设定适当的奖罚机制,对特殊贡献和补贴老人建立留存基金制度,并对各项分配因素实行动态管理。  相似文献   

14.
城镇化是由以农业为主的传统乡村社会向以工业和服务业为主的现代城市社会转变的历史过程。土地资源的优化配置是我国城镇化进程中面临的关键问题,城镇化与土地资源优化配置两者之间存在良性的互动关系。在大连全域城市化战略的大背景下,分析大连花园口经济区城镇化的发展现状、土地利用现状及其在土地利用中存在的主要问题,提出花园口经济区在城镇化进程中土地资源优化配置的路径,即确保发展规划的编制与宏观上位规划的协调一致性,及时调整和完善现有规划;探索生态文明的和谐发展方式,加强土地资源的可持续利用和生态环境保护;促进土地制度的创新,探索建立城乡统一的建设用地市场;促进土地资源优化配置模式的创新,提高土地利用效率。  相似文献   

15.
研究具有可加性和可乘性参数约束的QoS路由选择问题,以丢失率约束为例,给出了把问题的可乘性参数约束变换为可加性约束的方法,据此给出具有丢失率约束最小时延问题的一个线性0-1规划模型。利用该变换,对一个简单的网络拓扑,给出了该问题的一个动态规划算法,算法具有拟多项式时间复杂性。  相似文献   

16.
基于冲突图模型形成的二进制整数规划,提出了一种蜂窝网络中支持D2D通信的无线资源分配方法.首先,提出一种频率资源分配算法,即为每个D2D链路都分配一个频率资源块.分配频率资源时将尽可能地利用蜂窝网络中的无线频率资源空间重用机会.然后,提出一种时隙调度算法,即为所有分配同一频率资源块的D2D链路进行时隙资源调度.调度时隙资源时将保证使用同一频率资源块的D2D链路之间达到长期平均吞吐率的比例公平.通过计算机仿真对所提出方法的性能进行了验证,结果表明该方法能够在蜂窝网络中实现D2D通信功能.  相似文献   

17.
改进的DEA在物流中心选址中的应用   总被引:2,自引:0,他引:2  
目前我国的物流中心建设不规范,不仅功能不健全,更表现在盲目建设上.要使物流中心更好的发挥其功能,首先需要确定物流中心的最佳位置.本文针对传统的物流中心选址方法的不足,提出了一个改进的DEA模型,并通过实例证明了该模型的可行性和实用性.  相似文献   

18.
针对企业级JavaEE应用现有数据访问层解决机制,提出一种轻量级、可重用的数据访问层组件实现方案。方案基于XM L -关系数据映射和转换,数据库模型组件针对关系数据库表、视图进行建模,数据库访问控制组件和SQL动态构建组件根据数据库模型组件,结合XML格式数据,动态构造数据库存取SQL语句。项目实验表明,可以快速构建企业级JavaEE应用系统的数据访问层,提高系统可维护性和扩展性。  相似文献   

19.
为解决高校资产配置管理存在的问题,从外部形势及内部环境入手分析解决途径。以西南交通大学为例,阐述行之有效的解决措施-进行制度建设及体系构建。基于公房配置进行实物资产管理,基于大型仪器设备共享进行设备资产配置,促进高校资产开放共享。  相似文献   

20.
鉴于工程实践中项目的不确定性状态,以梯形模糊数的等效参数形式表达项目各项活动的持续时间,开展基于改进的模糊关键路径法(FCPM)的施工动态规划研究。有机整合向量的范数相似度和方向相似度,提出了向量集成相似度排序算法,有效地解决了关键路径识别中梯形模糊数的排序问题;采用修正的模糊减运算标准算法成功消除了模糊时间参数计算过程中的不可行解问题,并实现了对模糊状态下项目网络关键路径动态变化轨迹的刻画。实证分析证明,改进的FCPM求解施工动态规划问题具有合理性和有效性。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号