排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
Construction simulation and real-time control for high arch dam 总被引:1,自引:0,他引:1
A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the
high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By
combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis
based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic
adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed
hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next
stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides
an effective technical support for the construction and management of the dam.
ZHONG Denghua, born in 1963, male, Dr, Prof.
Supported by National Natural Science Foundation of China(No.50539120), National Basic Research Program of China(“973”Program,No.
2007 CB714101), National Science Fund for Distinguished Young Scholars of China(No.50525927), and National Natural Science
Foundation of China (No.50579045). 相似文献
1