首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
教育   1篇
  2016年   1篇
排序方式: 共有1条查询结果,搜索用时 15 毫秒
1
1.
A specialised electrochemical measurement cell was plugged into a pilot water distribution system to simulate the pipe inner-wall corrosion. The linear polarisation resistance(LPR) technique and electrochemical impedance spectroscopy(EIS) were measured in real time to study the variation of the corrosion rate(CR) and scale of cast iron. Three corrosion stages were observed according to the LPR analysis: an initial stage with significantly fluctuating CR, a developmental stage with slowly decreasing CR, and a stable stage with a low CR of approximately 0.157 5 mm·a~(-1). The EIS revealed that the scales with a compact outer layer and a porous inner layer finally formed in the stable stage, and the polarisation resistance was approximately 2 175 ?·cm~2. A physicochemical analysis of the scales showed that ferric oxides, oxyhydroxides and calcite made the outer layer compact and effectively limited the diffusion of oxygen through the scales, which resulted in a low CR.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号