基于Graph的铁道工程工期估算算法及实现
引用本文:涂玉芬.基于Graph的铁道工程工期估算算法及实现[J].温州职业技术学院学报,2011,11(4):52-55.
作者姓名:涂玉芬
作者单位:武汉铁路职业技术学院电子电气工程系,武汉,430205
摘    要:为有效帮助铁道工程技术管理人员进行工程工期估算,合理调度和控制各子工程的施工进度,运用Graph结构中的AOE网分析工期估算算法,可实现计算机辅助管理,有利于科学管理铁道工程。

关 键 词:Graph  铁道工程  工期估算  AOE网  关键活动

Calculation of Time Limit for Railway Engineering on Basis of Graph and its Implementations
TU Yufen.Calculation of Time Limit for Railway Engineering on Basis of Graph and its Implementations[J].Journal of Wenzhou Vocational & Technical College,2011,11(4):52-55.
Authors:TU Yufen
Institution:TU Yufen(Department of Electronic & Electric Engineering,Wuhan Railway Vocational College of Technology,Wuhan,430205,China)
Abstract:In order to help the manager of railway engineering to calculate the time limit for an engineering,to control the construction schedule of sub-projects,the AOE net in Graph structure is applied and it can achieve the goal of computer-assisted management and is beneficial for the scientific management of railway engineering.
Keywords:Graph  Railway engineering  Time limit for an engineering  AOE net  Key activities