首页 | 本学科首页   官方微博 | 高级检索  
     检索      


The Study of Construction Claims for International Project under FIDIC Conditions of Contract
Authors:JIAO Qing-jie
Institution:JIAO Qing-jie(China Railway Fifth Survey and Design Institute Group Co.Ltd,Beijing 102600,China)
Abstract:Claims over contracts in the building,engineering and construction industry are become common issues in business today.The text aims at presenting the key concepts of construction claim,and construction claim management,focusing on the common classifica tion.In addition,it introduces some measures trying to prevent the event of claim.The result from the text can help the contractors im prove their weaknesses and maintain their strengths of their claim management process.Meanwhile,it also gives some measures for owner to prevent the contractor’s claim.
Keywords:FIDIC Conditions of Contract  Claims  additional costs  extension of time
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号