一起35kV变压器线圈短路故障的检测过程及在生产中防范措施 |
| |
引用本文: | 龙飞.一起35kV变压器线圈短路故障的检测过程及在生产中防范措施[J].大科技.科学之谜,2013(23):171-172. |
| |
作者姓名: | 龙飞 |
| |
作者单位: | 桂林天湖水利电业设备有限公司,广西桂林市541213 |
| |
摘 要: | 本文,笔者主要结合案例,分析了变压器的线圈短路故障在生产过程中的防范措施。
|
关 键 词: | 变压器 短路 防范 措施 |
The detection of coil short circuit of a 35kV transformer winding and the preventive measures during the production process |
| |
Authors: | Long Fei |
| |
Institution: | Long Fei (Guilin Tian Hu Water Power Equipment Co., Ltd Guangxi Guilin 541213) |
| |
Abstract: | The preventive measures of coil short-circuit of the transformer winding in the production process. |
| |
Keywords: | transformer: coil short circuit prevention: measures |
本文献已被 维普 等数据库收录! |