首页 | 本学科首页   官方微博 | 高级检索  
     检索      

梨园水电站进场公路第十标段施工成本控制
引用本文:侯林峰,谢永亮.梨园水电站进场公路第十标段施工成本控制[J].长江工程职业技术学院学报,2011,28(1):52-54.
作者姓名:侯林峰  谢永亮
作者单位:武汉大学经济与管理学院;长江工程职业技术学院;
摘    要:分析了影响梨园水电站进场公路第十标段成本控制的主要因素,提出了在施工过程中成本控制的主要措施。

关 键 词:影响因素  成本控制  控制措施

Cost Control on the 10~(th)-Section of Access Road to Liyuan Hydropower Station
HOU Lin-feng,XIE Yong-liang.Cost Control on the 10~(th)-Section of Access Road to Liyuan Hydropower Station[J].Journal of Changjiang Engineering Vocational College,2011,28(1):52-54.
Authors:HOU Lin-feng  XIE Yong-liang
Institution:HOU Lin-feng XIE Yong-liang(1.School of Economy and Management of Wuhan University,Wuhan 430072,China,2.Changjiang Engineering Vocational College,Wuhan 430212,China)
Abstract:Key factors which influence the cost control of The access Road to Liyuan Hydropower Station are analysed and main measures for cost control during construction are proposed.
Keywords:influencing factor  cost control  control measures  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号