首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A two-step approach to investigate the effect of rating curve uncertainty in the Elbe decision support system
Authors:Yue-ping Xu  Harriette Holzhauer  Martijn J Booij  Hong-yue Sun
Institution:[1]Institute of Hydrology and Water Resources, Department of Civil Engineering, Zhejiang University, Hangzhou 310027, China [2]Water Engineering and Management, Faculty of Engineering Technology, University of Twente, 7500 AE, Ensehede, the Netherlands [3]Institute of Harbor, Coast and Offshore Engineering, Department of Civil Engineering, Zhejiang University, Hangzhou 310027, China
Abstract:For river basin management,the reliability of the rating curves mainly depends on the accuracy and time period of the observed discharge and water level data.In the Elbe decision suPPort system(DSS),the rating curves are combined with the HEC-6 model to investigate the effects Ofriver engineering measures on the Elbe River system.In such situations,the uncertainty originating from the HEC-6 model is of significant importance for the reliability of the rating curves and the corresponding DSS results.This paper proposes a two-step approach to analyze the uncertainty in the rating curves and propagate it into the Elbe DSS:analytic method and Latin Hypercube simulation.Via this approach the uncertainty and sensitivity of model outputs to input parameters are successfuIly investigated.The results show that the proposed approach is very efficient in investigating the effect of uncertainty and can play an important role in improving decision-making under uncertainty.
Keywords:Elbe decision support system(DSS)  Two-step approach  Uncertainty  HEC-6 model
本文献已被 维普 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号