本钢7#高炉F5转运站基础托换与结构加固技术
引用本文:黄作松,裴锐.本钢7#高炉F5转运站基础托换与结构加固技术[J].辽宁科技学院学报,2007,9(3):14-15.
作者姓名:黄作松  裴锐
作者单位:本钢炼铁厂,辽宁,本溪,117000;辽宁科技学院,资源与建筑工程系,辽宁,本溪,117022
摘    要:文章针对本钢1#高炉矿焦槽基础施工时对邻近的原有7#高炉F5转运站基础稳固造成影响,通过采用托换技术施工,即采用人工挖孔灌注桩上加托梁的方法对原有F5转运站基础进行了加固,解决这一施工难题,保证了新1#高妒基础施工的顺利进行.

关 键 词:基础  灌注桩  托换
文章编号:1008-3723(2007)03-0014-02
收稿时间:2006-04-16

On Repairing and Reinforcing the Foundation of the Transfer Post F5 for the Blast Furnace No.7
HUANG Zuo-song,PEI Rei.On Repairing and Reinforcing the Foundation of the Transfer Post F5 for the Blast Furnace No.7[J].Journal of Liaoning Institute of Science and Technology,2007,9(3):14-15.
Authors:HUANG Zuo-song  PEI Rei
Institution:1 Iron Making Plant, Benxi Steel,Benxi,Liaoning, 117000; 2 Dept. of Resource and Architecture Engineering, Liaoning Institute of Science and Technology ,Benxi , Liaoning , 117022, China
Abstract:The foundation of the transfer post F5 for the former blast furnace No. 7 has been impacted by the nearby construction work of the coke trough for the blast furnace Nol during its heavy repair. We have solved the difficult problem by using the replaceable technology, which reinforces the foundation with an additional support beam on casted piles.
Keywords:Foundation  Casted piles  Replacement
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号