后浇带的设置与设计
引用本文:于淼.后浇带的设置与设计[J].大连大学学报,2007,28(3):33-35.
作者姓名:于淼
作者单位:大连开发区,长城建设监理有限公司,辽宁,大连,116600
摘    要:近年来,在设计和施工方面常采取有效措施,尽量增大结构伸缩缝间距或者是不设置伸缩缝,以减少工程造价及降低施工难度.在适当增大伸缩缝最大间距的各项措施中,常用的做法是设置施工后浇带.本文结合工程实例,就如何设置和设计施工后浇带进行简单的阐述.

关 键 词:后浇带  设置  设计
文章编号:1008-2395(2007)03-0033-03
修稿时间:2007-03-272007-04-23

Shallow Discussions for the Establishment and Design of the Latter Pouring Belt of Construction
YU Miao.Shallow Discussions for the Establishment and Design of the Latter Pouring Belt of Construction[J].Journal of Dalian University,2007,28(3):33-35.
Authors:YU Miao
Institution:Great Wall Construction Supervision Co. Ltd. ,Dalian Development Zone ,Dalian 116600 , China
Abstract:In recent years,an effective action is often taken in the design and the construction aspect,that is to increase the joint spacing of the structure expansion as far as possible,or not to establish the expansion joint,so as to reduce the cost of project construction and also to decrease the difficulty of the construction.In the measures of increasing suitably the biggest space of the expansion joint,the commonly used effective procedure is to establish the Latter pouring belt.An example of real project is used in this paper to illustrate how to realize the establishment and the design of Latter pouring belt.
Keywords:latter pouring belt  establishment of letter pouring belt  design of letter pouring belt  