广西石化CCR联合装置旋挖灌注桩桩基监理实践
引用本文:董显明,王德涛,范振杰.广西石化CCR联合装置旋挖灌注桩桩基监理实践[J].科技成果管理与研究,2008(9):92-94.
作者姓名:董显明  王德涛  范振杰
作者单位:中油兰州石化工程公司,甘肃,兰州,730060
摘    要:广西石化CCR联合装置旋挖灌注桩桩径800(mm),设计要求的承载力特征值2000Kn.监理通过对旋挖灌注桩施工过程前准备及施工过程的有效控制保证了施工质量。经低应变对桩身完整性检测,高应变及抗压静载试验对承载力的检测,桩基施工质量完全达到了设计要求。

关 键 词:旋挖灌注桩  桩基  监理

Petro-China Guangxi Re finery Project Spin-dug pile Management Practice
DONG Xian-ming,WANG De-tao,FAN Zhen-jie.Petro-China Guangxi Re finery Project Spin-dug pile Management Practice[J].Management and Research on Scientific & Technological Achievements,2008(9):92-94.
Authors:DONG Xian-ming  WANG De-tao  FAN Zhen-jie
Institution:(Petro-China Lanzhou Petrochemical Contracting & Engineering Corporation, Lanzhou 730060, China )
Abstract:The diameter of PetroChina Guangxi Refinery Project spin-dug pile is 800mms, and the bearing capacity of design features is 2000 Kn.Under the control of pre-construction process and construction process by supervision, construction quality is effectively controlled.Through low strain test on the shaft integrity testing, high-strain and test of vertical compression static on the bearing capacity, pile foundation quality meets the requirements comply with the design features.
Keywords:spin-dug pile  pile foundation  supervision