QUASI-CRITICAL PATH METHOD FOR CONTROLLING THE START-TIME OF ACTIVITY
作者姓名:胡汉辉
作者单位:College of
摘    要:A new idea of Quasi-Critical Path has been defined in terms of the thoughtof Critical Path for the network method.The paper studies the time control problem of anetwork with forced start-time activity by both the optimal criterion of minimal reducedtime and the concept of Quasi-Critical Degree of activity,and proposes a feasible heuristicalgorithm.Another simpler algorithm is also presented,which can be realized inmicrocomputer.


QUASI-CRITICAL PATH METHOD FOR CONTROLLING THE START-TIME OF ACTIVITY
Hu Hanhui.QUASI-CRITICAL PATH METHOD FOR CONTROLLING THE START-TIME OF ACTIVITY[J].Journal of Southeast University(English Edition),1992(1).
Authors:Hu Hanhui
Institution:College of Management
Abstract:A new idea of Quasi-Critical Path has been defined in terms of the thought of Critical Path for the network method.The paper studies the time control problem of a network with forced start-time activity by both the optimal criterion of minimal reduced time and the concept of Quasi-Critical Degree of activity,and proposes a feasible heuristic algorithm.Another simpler algorithm is also presented,which can be realized in microcomputer.
Keywords:industrial engineering  network method  heuristic approach/Quasi-Critical Path  Quasi-Critical Degree of activity